DE
EN
Products
Tie Rods for Marine Structures
Anchorings
Horizontal tie-rods
Tie Bar Connections
Fittings
Micropiles
Walings
Walings and Splice Connections
Waling Bolts
Design Guidelines for Dead-Man Tie Rods
Overview
Anchor tie bars
Design Considerations
Relevant Design Information
Typical Tie Bar Configurations and Connections
Tie rod site assembly & installation
Tie Rod Design Example
Quay Wall Accessories
Bollards
Seeport 50 - 3000 kN
Double Bollards 500 - 3000 kN
Rotterdam 300 - 2500 kN
DIN 19703 & Binnen 50 - 300 kN
Recessed Bollards 200 - 500 kN
Welded Mooring Pins & Barge Holders
Anchors for Geotechnics
Micropiles
Structural Tie Bars
ASDO Structural Tie Bar Systems
System ASDO-S, ASDO-E
ASDO Cross Bracing
Compression Struts ASDO-D
Bowstring trusses
Structural Tie Bars for bridges
CAD-DATA ASDO TIE BAR SYSTEMS
2D COMPONENTS
3D COMPONENTS
bocad
Tekla Structures
Heavy machinery and lifting
Piston rod blanks
Heavy special bolts
Upset forged parts / Flanged shaft
Tension rods
Shackles
Bending components
References
Marine Project References
Liverpool 2 Container Port, UK
Felixstowe Berth 9 Extension, UK
Aqaba Container Port, Jordanien
London Gateway, UK
Port Autonome Le Havre, Frankreich
Nigg Energy Park, UK
Structure Project References
Be‘er Sheva University Bridge
Wolverhampton Football Club, UK
Hangers for the Schnettkerbruecke
Manchester City Football Club, UK
London Cannon Place, UK
Shoreditch Bridge, UK
Madrid District Heating, Spanien
Company
Production program
Qualitymanagement
History
ASDO contacts
Partner
News
100 years of Anker Schroeder (1930-1939)
Congratulations to Stephan Lerche for obtaining his Master of Science in Mechanical Engineering
Anniversary 100 Years of Anker Schroeder
MR. JEAN-FRANÇOIS GARCIA JOINED THE ASDO TEAM
CAD Integration in AVEVA bocad and Tekla
EN 1090-2
Contact
You are here:
Products - Anker Schroeder | EN
References
Structure Project References
Shoreditch Bridge, UK
Structural Tie Bars for Shoreditch Bridge, UK
ASDO540-S tie bars
are used as hangers on this East London Line railway bridge in Shoreditch.
Client
Surrey County Council
Year
2013
ASDO-System
ASDO540-S M90
Load Capacity
Up to 3,059 kN
Features
fine-grained quenched and tempered alloy steel
System was fatigue tested to 2 million cycles
Similar Projects
Walton Bridge, Walton Bridge, UK
Next projects
London Cannon Place, UK
Madrid District Heating, Spanien