The innovative three tied-arch bridge is part of the new A-44 Sierra Nevada Motorway built by Grupo Copisa and Construcciones Vera and will contribute to easing traffic flow on the heavily congested Granada ring-road. An interesting video can be seen here.
ASDO540-S
28 Sets M 72
26 Sets M 80
over 14m length